Max. Lifting Capacity | |
---|---|
Boom Length | |
Overall Weight |
Specifications |
QY8D | ||
Performance |
Max. rated capacity (kg) |
8000 | |
Max. lifting torque basic jib (kN·m) |
245 | ||
Max. lifting torque |
140/87 | ||
Max. lifting height main boom (m) |
19.5 | ||
Max. lifting height auxiliary jib (m) |
26 | ||
Turntable tailswing radius (m) |
1.83 | ||
Speed |
Max. speed main winch single line (m/min) |
110 | |
Max. speed auxiliary winch single line (m/min) |
--- | ||
Time full extended / retracted (s) |
25/30 | ||
Luffing time (s) |
21/35 | ||
Slewing speed (r/min) |
0~2.4 | ||
Outriggers telescopic speed |
14/20 | ||
Traveling |
Max. traveling speed (km/h) |
85 | |
Max. gradability (%) |
28 | ||
Min. turning diameter (m) |
15 | ||
Min. ground clearance (mm) |
260 | ||
Approaching / Departure angle (°) |
Nov-34 | ||
Fuel consumption per 100 (L) |
~18 | ||
Quality |
G.V.W (kg) |
10480 | |
Front axle load (kg) |
2800 | ||
Rear axle load (kg) |
7680 | ||
Size |
Overall dimension (L*W*H) (mm) |
8560×2430×3130 | |
Outriggers footprints longitudinal (mm) |
3450 | ||
Outriggers footprints horizontal (mm) |
4250 | ||
Main boom (m) |
7.8~18.86 | ||
Main boom elevation angle (°) |
-2~78.5 | ||
Auxiliary jib (m) |
6.5 | ||
Jib installation angle (°) |
5 | ||
Chassis |
Model |
EQ1100FLJ | |
Engine |
Rated power kW/(r/min) |
105/2500 | |
Max. torque N.m/(r/min) |
500/1400~1600 |
Beijing Jingcheng Heavy Industry Co., Ltd.
Name : JINGCHENG HEAVY INDUSTRY
Service Tel : 0086-10-52105959
E-mail : sales@jchic.com
Web Site : http://c1667678728.bj.wezhan.cn/
Address : Xinghu Industrial Garden, Taihu Town, Tongzhou District, Beijing, China
Copyright Notice 2002-2019 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China